A bulk input-delay command constrained the clock port. What is the impact?
From PDVerse PnR Interview Handbook, part of the pdVerse Mentor Guide
Short Answer
A bulk set_input_delay [all_inputs]-style command is a footgun on any design where the clock is also a top-level port, because it accidentally treats the clock pin as ordinary data. The clock port is supposed to be excluded from data-path constraints โ it defines the timing reference itself, it isn't a signal that arrives relative to that reference.
Technical Explanation
- Once input delay is applied to the clock port, the tool can start modeling misleading boundary timing paths through the clock pin as if it were a data input, producing bogus arrival/required-time relationships that don't correspond to anything real in the design.
- g. filtering
all_inputsagainstall_clocksbefore applyingset_input_delay. - The failure mode is sneaky because it doesn't crash or obviously error โ it just quietly pollutes the timing report with phantom paths, and an engineer chasing a "why is there a path through my clock pin" mystery can burn real time before realizing the root cause is a constraint-scope mistake.
- General lesson: any bulk/wildcard constraint command needs a sanity check against object class (is this actually a clock? a power pin? ) before it's trusted โ bulk convenience commands are exactly where selector-scope bugs like this hide.
What To Check
- Warning sign: report_ports shows input delay on clocks, resets, or non-data controls.
- Inspect: Keep at least two possible causes open, then use one named object and the active mode or scenario to separate them.
- Correct: Replace the wildcard with explicit data-port collections, reload the SDC cleanly, and verify membership.
Command Checks & Actions
- report_ports -input_delay [get_ports *]: shows boundary constraints and electrical assumptions
- report_clocks: shows clock definitions and relationships
Run the commands in order. Each line answers a separate part of the check.
Healthy, Suspicious & Hard-stop Results
- Expected: It models the clock port as ordinary data and can create misleading boundary paths or constraints; selector scope is defective.
- Stop before floorplanning when required logic or timing coverage is missing or unexplained.
Common Mistake
The Trap: Do not assume the check passed just because ICC2 continued. Fix or narrowly justify the named objects, then rerun the same command.
What The Interviewer Is Testing
Be ready to explain why this matters before floorplanning.
Follow-up Question & Model Response
Model response: โI would save the report, inspect one affected object in the correct block and scenario, and make or request this correction. โ
Physical Design & Planning Handbook
Master ASIC Physical Design Planning & Floorplanning
Dive into 14 comprehensive chapters covering netlist sanity, FinFET grids, macro placement, power grids, CTS, and timing budgeting.
Offline PDF Bundle
Want all 1109 questions offline?
Get the complete 4-book PDF bundle (PnR, STA, MMMC, Low Power) with a clickable table of contents - no ads, no internet needed.

Continue practising