IntermediateQuestion 81 of 222

How do you test a power-grid reservation against signal-routing capacity?

From PDVerse PnR Interview Handbook, part of the pdVerse Mentor Guide

Short Answer

Power and signal nets are competing for exactly the same finite set of routing tracks โ€” reserving generous PG rings/straps without checking their impact on signal capacity is a common way to create congestion you don't discover until much later. The test is to overlay the proposed ring, strap, rail, and via corridors onto the same channel/congestion model you use for signal routing, then look at how many tracks and pin approaches remain once PG has taken its share.

Technical Reference DiagramHow do you test a power-grid reservation against signal-routing capacity?

Technical Explanation

  • Inputs to this analysis: current estimates and supply sources, macro PG pin locations, layer direction, PG width/pitch/spacing, the via strategy connecting layers, and the voltage-drop/EM targets the grid has to meet.
  • This check is explicitly a pre-signoff sanity pass โ€” you're not trying to fully implement PG or run signoff yet, just confirm the reservation doesn't strangle signal routing before you commit to it.
  • If the overlay shows a shortfall, it's cheaper to fix by adjusting the PG plan now than to discover it as a routing DRC failure much later in the flow.

Formula Or Decision Rule

Decision rule: accept the plan only if post-reservation signal capacity and PG feasibility both remain credible.

What To Check

  • Warning sign: A clean signal map was produced before power corridors were reserved.
  • Inspect: choose one affected region, macro, row, pin, path, or net and trace the physical cause.
  • Correct: Add the planning reservation, rerun routing/pin checks, and revise the competing resource plan.

Command Checks & Actions

  • check_design -checks {dp_pre_power_insertion}: runs named design-planning check groups
  • report_congestion -mode summary: reports routing demand, capacity, overflow, or hot spots

Run only the commands needed for this question. Save the report with the floorplan version and analysis context.

Healthy, Suspicious & Hard-stop Results

  • Healthy: Overlay proposed ring, strap, rail, and via corridors on the same channel and congestion model used for signals, then compare remaining tracks and pin approaches.
  • Hard stop: required legality or physical feasibility is missing or unexplained.

Common Mistake

The Trap: Do not hide the symptom with an arbitrary utilisation, halo, channel, blockage, pin move, or die-size change.

What The Interviewer Is Testing

โ€ to measurable physical evidence and an owned correction.

Follow-up Question & Model Response

"* Candidate Model Response: Model response: โ€œI would change it if the same controlled rerun shows that a clean signal map was produced before power corridors were reserved. โ€

Physical Design & Planning Handbook

Dive into 14 comprehensive chapters covering netlist sanity, FinFET grids, macro placement, power grids, CTS, and timing budgeting.

Offline PDF Bundle

Want all 1109 questions offline?

Get the complete 4-book PDF bundle (PnR, STA, MMMC, Low Power) with a clickable table of contents - no ads, no internet needed.

See what's inside the bundle
PnR Flow Physical Design Mentor Guide โ€” eight chaptersPnR Flow Mentor GuideEight chapters, library setup through to stream-out.