Short Answer

Shape and size it for assigned cells, expected growth, legal rows, boundary cells, isolation/level-shifter/retention zones, switch corridors, macro compatibility, and supply access.

Technical Reference DiagramHow do you plan a usable voltage area?

Technical Explanation

  • Physical voltage area planning translates logical multi-voltage power intent [UPF create_power_domain] into legal, DRC-compliant silicon bounding boxes via create_voltage_area.
  • Sizing & Utilization: Size the physical region by calculating the total standard cell gate area of the assigned power domain, applying a conservative target utilization (50% to 65%) with a 10% to 15% whitespace growth reserve to accommodate post-placement buffer insertion and hold fix repeaters.
  • 0. Enforce minimum corridor widths (>= 15 to 20 um) to prevent narrow slivers where standard cell rows cannot legalize or where routing tracks become unroutable.
  • Boundary & Protection Cells: Allocate dedicated perimeter guardbands for Level Shifter (LS) cells (translating between voltage domains) and Isolation (ISO) clamp cells (holding signals to known logic levels when a domain powers down).
  • Power Switch Architecture: Reserve physical corridors for header or footer power switch transistors (MTCMOS) with low-impedance daisy-chain control routing to manage power-up inrush current and avoid ground bounce.

Formula Or Decision Rule

Decision rule: domain cells and required interface cells fit legally without stranded slivers.

What To Check

  • Warning sign: The region encloses enough area but cuts rows into unusable fragments or blocks supplies.
  • Inspect: choose one affected region, macro, row, pin, path, or net and trace the physical cause.
  • Correct: Reshape or move the region, rebuild affected rows/boundaries, and rerun multivoltage and floorplan checks.

Command Checks & Actions

  • create_voltage_area -power_domains <domain_list> -region <region_list> -target_utilization <ratio> -name <voltage_area>: creates a physical region for one or more power domains
  • report_design -floorplan: reports the floorplan state understood by the tool

Run only the commands needed for this question. Save the report with the floorplan version and analysis context.

Healthy, Suspicious & Hard-stop Results

  • Hard stop: required legality or physical feasibility is missing or unexplained.

Common Mistake

The Trap: Do not hide the symptom with an arbitrary utilisation, halo, channel, blockage, pin move, or die-size change.

What The Interviewer Is Testing

โ€ to measurable physical evidence and an owned correction.

Follow-up Question & Model Response

"* Candidate Model Response: Model response: โ€œI would change it if the same controlled rerun shows that the region encloses enough area but cuts rows into unusable fragments or blocks supplies. โ€

Physical Design & Planning Handbook

Dive into 14 comprehensive chapters covering netlist sanity, FinFET grids, macro placement, power grids, CTS, and timing budgeting.

Offline PDF Bundle

Want all 1109 questions offline?

Get the complete 4-book PDF bundle (PnR, STA, MMMC, Low Power) with a clickable table of contents - no ads, no internet needed.

See what's inside the bundle
PnR Flow Physical Design Mentor Guide โ€” eight chaptersPnR Flow Mentor GuideEight chapters, library setup through to stream-out.