ExpertQuestion 43 of 50

How do you choose activity and corners for power signoff?

From PDVerse Low-Power Physical Design Mentor Guide, part of the pdVerse Mentor Guide

Short Answer

Match the activity source to the question you are answering: default toggle rates for early budgets, SAIF from realistic use-case simulation for average power, and a VCD window around the worst event for peak power. Then pick the corner that makes that number worst, which is the fast, high-voltage, hot corner for leakage and the highest mode voltage for dynamic power.

Technical Reference DiagramHow do you choose activity and corners for power signoff?

Technical Explanation

  • Default or vectorless activity: available before testbenches exist and fine for floorplan budgets, but it can be far off on real workloads.
  • SAIF: toggle counts and static probabilities per net over a simulation; the right input for average power in a named use case.
  • VCD: cycle-by-cycle value changes; needed for peak and time-based power, and it captures glitches when the gate-level run is timed.
  • Use-case coverage: simulate modes the product actually spends time in, such as idle, video and boot, and weight them by duty cycle for battery life.
  • Corners: leakage rises steeply with temperature and voltage, so FF, high voltage and hot bound it; dynamic power scales with V squared.
  • PrimePower flow: set_app_var power_enable_analysis true (PT), read_saif (PT) or read_vcd (PT), update_power (PT), then report_power (PT).
  • What breaks: a signoff number from default toggle rates or one short directed test cannot be defended, and thermal or battery budgets fail later.
# [PrimeTime]  pt_shell
set_app_var power_enable_analysis true
read_saif video_1080p.saif
update_power
report_power

What To Check

  • Each reported number names its purpose (budget, average or peak) and its activity source.
  • SAIF annotation covers nearly all registers and clock nets; the rest fall back to default rates.
  • Use cases are weighted by the time the product spends in them.
  • Each number uses its own worst corner: FF, high voltage, hot for leakage; the mode's highest voltage for dynamic.

Command Checks & Actions

PrimeTime (pt_shell)set_app_var power_enable_analysis true

Enable PrimePower analysis in the PT session

PrimeTime (pt_shell)read_saif video_1080p.saif

Annotate average switching activity from the use-case simulation

PrimeTime (pt_shell)read_vcd frame_start_peak.vcd

Annotate time-based activity for the peak-power window

PrimeTime (pt_shell)update_power

Run the power analysis with the annotated activity

PrimeTime (pt_shell)report_power

Report internal, switching and leakage power

Healthy, Suspicious & Hard-stop Results

  • Healthy (illustrative): Video use case: 410 mW average from SAIF, 97% of nets annotated, at the 0.9 V mode voltage.
  • Suspicious (illustrative): Only 70% of nets annotated, so almost a third of the design runs on default toggle rates.
  • Hard stop: The signoff number comes from default toggle rates, or leakage was reported only at the typical 25 °C corner.

Common Mistake

The Trap: Reporting power from one short directed test and calling it the signoff number.

  • A short test drives a few blocks hard and leaves others idle, so the average is wrong in either direction, and the battery and thermal budgets are built on it.

What The Interviewer Is Testing

  • Do you match activity format to the question: budget, average or peak?
  • Do you know which corner is worst for leakage and which for dynamic power?

Follow-up Question & Model Response

"Why not use one long VCD for everything?"

Candidate Model Response: A VCD from a long gate-level run is huge and slow to read, and for average power it adds little over a SAIF of the same run. A SAIF cannot give peak power, because it stores totals and probabilities rather than when each toggle happened. So you use SAIF for averages over long use cases and a short VCD window for the worst burst. The skill is choosing that window, usually from a power-over-time profile of a cheaper run.

Practical Example

Design Scenario: (illustrative) A camera SoC needs four numbers. The floorplan budget uses default toggle rates and gives 520 mW. Battery signoff uses SAIF from a 10 ms 1080p recording simulation with 97% of nets annotated and gives 410 mW average at 0.9 V. The package peak uses a 2 µs VCD window around the frame-start burst and gives 1.3 W. Leakage is 35 mW at the typical corner and 140 mW at FF, 0.99 V, 125 °C, and the thermal budget uses 140 mW.

Low-Power & UPF Handbook

Read the complete low-power guide library covering power domains, level shifters, isolation clamps, state retention, and UPF signoff verification.

Offline PDF Bundle

Want all 1109 questions offline?

Get the complete 4-book PDF bundle (PnR, STA, MMMC, Low Power) with a clickable table of contents - no ads, no internet needed.

See what's inside the bundle
VLSI Physical Design Planning Handbook — fourteen chaptersDesign PlanningFourteen chapters, floorplanning through timing budgets.